IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KSV_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Kosovo, 2012 - 2013
Get Microdata
Reference ID
KSV_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
16667
Downloads
2059
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • kosovo_2013_full_data

Number of days it took to obtain a construction-related permit (g3)

Data file: kosovo_2013_full_data

Overview

Valid: 51
Invalid: 151
Type: Discrete
Decimal: 0
Start: 733
End: 735
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
-6
1
7
12
14
15
21
30
40
45
60
90
180
200
365
387
435
520
720
730
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.