IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ARM_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Armenia, 2012 - 2013
Get Microdata
Reference ID
ARM_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
22482
Downloads
2650
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • armenia_2013_full_data

Informal gift/ payment expected/requested to obtain water connection? (c14)

Data file: armenia_2013_full_data

Overview

Valid: 9
Invalid: 351
Type: Discrete
Decimal: 0
Start: 260
End: 261
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category
-9 Don't know
-8 Refused
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.