IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ARM_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Armenia, 2012 - 2013
Get Microdata
Reference ID
ARM_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
22531
Downloads
2650
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • armenia_2013_full_data

Net book value of machinery (n6a)

Data file: armenia_2013_full_data

Overview

Valid: 111
Invalid: 249
Type: Discrete
Decimal: 0
Start: 1174
End: 1183
Width: 10
Range: -
Format:

Questions and instructions

Literal question
At the end of fiscal year [insert last complete fiscal year], what was the net book value, that is the value of assets after depreciation, of the following:
Machinery, vehicles, and equipment
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
0
111365
320000
3000000
4000000
4244000
6000000
8126000
14650000
16629000
18000000
35000000
40000000
50000000
61000000
70000000
94514000
117000000
120000000
132000000
200000000
236000000
242690000
270000000
310000000
557206000
566851000
800000000
2000000010
3000000010
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Net book value equals the purchase value minus depreciation.

The net book value represents the actual cost of assets at the time they were acquired, including all costs incurred in making the assets usable (such as transportation and installation) minus depreciation accumulated since the date of purchase. Included in the assets are all buildings, structures, machinery, and equipment (production, office, and transportation equipment) for which depreciation reserves are maintained. Accordingly, the value of assets at the end of the year includes the value of construction in progress.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.