IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZMB_2007_ES-P_V02_M / variable [F2]
central

Enterprise Survey 2007-2013

Zambia, 2007 - 2013
Get Microdata
Reference ID
ZMB_2007_ES-P_v02_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
13177
Downloads
2051
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Zambia_2007_2013_Panel

When You Applied For A Water Connection, Was An Informal Gift/payment Requested? (c14)

Data file: Zambia_2007_2013_Panel

Overview

Valid: 71
Invalid: 1133
Type: Discrete
Decimal: 0
Start: 402
End: 403
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category
-9 DK
-8 Refuse
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.