IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZMB_2007_ES-P_V02_M / variable [F2]
central

Enterprise Survey 2007-2013

Zambia, 2007 - 2013
Get Microdata
Reference ID
ZMB_2007_ES-P_v02_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
13168
Downloads
2051
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Zambia_2007_2013_Panel

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Zambia_2007_2013_Panel

Overview

Valid: 120
Invalid: 1084
Type: Discrete
Decimal: 0
Start: 369
End: 371
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 DK
-6 Still in process
-5 Application denied
1 Less than one day
2
3
4
5
7
10
14
18
21
23
30
35
60
85
90
120
150
155
180
230
240
730
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.