IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / HRV_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Croatia, 2013
Get Microdata
Reference ID
HRV_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
17992
Downloads
2245
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Croatia-2013-full
    data

Number of days it took to obtain a construction-related permit (g3)

Data file: Croatia-2013-full data

Overview

Valid: 55
Invalid: 305
Type: Discrete
Decimal: 0
Start: 690
End: 692
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
-6
2
6
7
10
15
30
40
45
60
90
120
150
180
210
250
360
365
450
720
730
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.