IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BGR_2013_ES_V02_M / variable [F1]
central

Enterprise Survey 2013

Bulgaria, 2012 - 2013
Get Microdata
Reference ID
BGR_2013_ES_v02_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
19738
Downloads
2343
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • bulgaria_2013_full_data

Number of days it took to obtain electrical connection (c4)

Data file: bulgaria_2013_full_data

Overview

Valid: 27
Invalid: 266
Type: Discrete
Decimal: 0
Start: 221
End: 223
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
-6
-5
1
10
14
15
20
30
60
90
100
150
180
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.