Questionnaires
Schedule 0.21 consists of the following six blocks.
Block 0: descriptive identification of sample slum
Block 1: identification of sample slum
Block 2: particulars of field operation
Block 3: particulars about slum
Block 4: change in the condition of the slum during the last 5 years
Block 5: remarks by investigator
Block 6: comments by supervisory officer(s)
Blocks 0 and 1 are meant to record the identification of the selected slum(s); blocks 2, 5 and 6 are for reporting particulars of field operations, remarks by the investigator and comments by the supervisory officer(s). In blocks 3 and 4, data were to be collected for each slum inside the selected fsu.
Some general features about the slum were collected in block 3. Information relating to the area where the slum is located, condition of the road / lane / constructed path within and surrounding the slum, and type of basic amenities like electricity, drinking water, sewerage, drainage, garbage disposal, etc. were collected in this block. In block 4, information on any improvement/change in the condition with respect to some amenities of the slum during the last 5 years were collected.