| Value | Category | Cases | |
|---|---|---|---|
| ARREGLO CAÑERIA DE S | 1 |
7.7%
|
|
| ARREGLO DE PUERTAS | 1 |
7.7%
|
|
| BOMBA | 1 |
7.7%
|
|
| CEMENTADO | 1 |
7.7%
|
|
| GASTOS EN LIMPIEZA | 1 |
7.7%
|
|
| MANTENIMIENTO LIMPIE | 1 |
7.7%
|
|
| MEDIDOR DE LUZ | 1 |
7.7%
|
|
| METIO TIERRA | 1 |
7.7%
|
|
| PARQUETEADO | 1 |
7.7%
|
|
| PISOS | 1 |
7.7%
|
|
| REFACCION DORMITORIO | 1 |
7.7%
|
|
| REPARACION DE FACHAD | 1 |
7.7%
|
|
| SACO TIERRA DEL PRED | 1 |
7.7%
|