IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AFG_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Afghanistan, 2013
Get Microdata
Reference ID
AFG_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Apr 07, 2014
Last modified
Mar 29, 2019
Page views
55532
Downloads
6171
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Afghanistan-2014-full
    data-

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: Afghanistan-2014-full data-

Overview

Valid: 123
Invalid: 233
Type: Discrete
Decimal: 0
Start: 121
End: 122
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Over fiscal year 1391, did this establishment experience insufficient water supply for production?
Categories
Value Category
-7
1 Yes
2 No
7 The establishment does not use water for production
9 DON'T KNOW (SPONTANEOUS)
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.

Others

Notes
C15. Over fiscal year 1391, did this establishment experience insufficient water supply for production?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.