IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AFG_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Afghanistan, 2013
Get Microdata
Reference ID
AFG_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Apr 07, 2014
Last modified
Mar 29, 2019
Page views
55434
Downloads
6171
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Afghanistan-2014-full
    data-

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Afghanistan-2014-full data-

Overview

Valid: 6
Invalid: 350
Minimum: -9
Maximum: 300
Type: Continuous
Decimal: 0
Start: 117
End: 119
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?

Others

Notes
C13. In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.