IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AFG_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Afghanistan, 2013
Get Microdata
Reference ID
AFG_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Apr 07, 2014
Last modified
Mar 29, 2019
Page views
55405
Downloads
6171
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Afghanistan-2014-full
    data-

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Afghanistan-2014-full data-

Overview

Valid: 45
Invalid: 311
Minimum: -9
Maximum: 360
Type: Continuous
Decimal: 0
Start: 436
End: 438
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Interviewer instructions
Waiting time for construction permit. Self-explanatory

Others

Notes
G3. In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.