IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AZE_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Azerbaijan, 2008 - 2009
Get Microdata
Reference ID
AZE_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
21951
Downloads
1540
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Azerbaijan2009_idstd

how many days did it take for you to receive an electrical connection service? (c4)

Data file: Azerbaijan2009_idstd

Overview

Valid: 49
Invalid: 331
Type: Discrete
Decimal: 0
Start: 284
End: 285
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 don't know
-6 still in process
-5 application denied
1 less than one day
2
3
4
5
6
7
10
14
15
30
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.