IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AZE_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Azerbaijan, 2008 - 2009
Get Microdata
Reference ID
AZE_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
21765
Downloads
1540
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Azerbaijan2009_idstd

applied to obtain an electrical connection submitted over the last two years? (c3)

Data file: Azerbaijan2009_idstd

Overview

Valid: 380
Invalid: 0
Type: Discrete
Decimal: 0
Start: 282
End: 283
Width: 2
Range: -
Format:

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING. Now, we turn to the establishment's operations in fiscal year 2007.
Literal question
Over the last two years, did this establishment submit an application to obtain an electrical connection?
Categories
Value Category
-9 don't know
1 yes
2 no
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Application for electrical connection.
Electrical connection refers to a new connection or to an increase in voltage of an existing connection that requires an application.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.6
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.