IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AZE_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Azerbaijan, 2008 - 2009
Get Microdata
Reference ID
AZE_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
21842
Downloads
1540
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Azerbaijan2009_idstd

approx. collateral needed as % of the loan value \ value of the line of credit (k15)

Data file: Azerbaijan2009_idstd

Overview

Valid: 65
Invalid: 315
Type: Discrete
Decimal: 0
Start: 738
End: 740
Width: 3
Range: -
Format:

Questions and instructions

Literal question
Referring only to this most recent line of credit or loan, what was the approximate value of the collateral required as a percentage of the value of the loan or line of credit?
Categories
Value Category
-9 don't know
20
30
40
50
60
70
100
150
200
300
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Value of collateral - self explanatory
Question post text
INTERVIEWER: THE ANSWER COULD BE GREATER THAN 100%
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.