IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2010_SEDAP_V01-ID_M / variable [F6]
central

Survai Evaluasi Dampak PNPM/PPK 2010

Indonesia, 2010
Get Microdata
Reference ID
IDN_2010_SEDAP_v01-ID_M
Producer(s)
Survey Meter
Metadata
DDI/XML JSON
Created on
Feb 19, 2014
Last modified
Mar 29, 2019
Page views
115083
Downloads
62972
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • idv_b5a1
  • idv_b5a2
  • idv_b5a3
  • idv_b5a4
  • idv_b5c
  • idv_b5d
  • idv_cov
  • idv_cp
  • msp_cov
  • msp_cp
  • msp_ic
  • msp_pik
  • msp_pm1
  • msp_pm2
  • msp_ppk
  • msp_tb
  • msp_tk1
  • msp_tk2
  • rt_b2
  • rt_b4a
  • rt_b6
  • rt_b7a
  • rt_b7b
  • rt_cov
  • rt_cp
  • rt_ik
  • t1_form
  • t1_formx
  • rt_b1

Jumlah total jam kerja hari seminggu yang lalu (b5r26b8_10)

Data file: idv_b5d

Overview

Valid: 18899
Invalid: 16651
Minimum: 0
Maximum: 144
Type: Continuous
Decimal: 0
Start: 130
End: 132
Width: 3
Range: -
Format:

Questions and instructions

Literal question
Jumlah jam kerja dari seluruh pekerjaan setiap hari selama seminggu yang lalu?
8. Jumlah (Otomatis diisi program)
Interviewer instructions
Pewawancara tidak usah menjumlahkan total jam kerja selama seminggu yang lalu, karena penjumlahan jam kerja tersebut otomatis diisi oleh program data entri.

Description

Universe
Untuk anggota rumah tangga yang berumur 10 tahun atau lebih
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.