IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2011_SUSENAS-POOLED_V01-ID_M / variable [F7]
central

Survei Sosial Ekonomi Nasional 2011

Indonesia, 2011
Reference ID
IDN_2011_SUSENAS-POOLED_v01-ID_M
Producer(s)
Badan Pusat Statistik
Metadata
DDI/XML JSON
Created on
Jul 10, 2013
Last modified
Mar 29, 2019
Page views
36386
Downloads
5746
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • susenas11pool_ki
  • susenas11pool_kr
  • susenas11pool_41
  • susenas11pool_42
  • susenas11pool_41_kalori
  • susenas11pool_43

Jumlah jam kerja (b5r28b)

Data file: susenas11pool_ki

Overview

Valid: 517234
Invalid: 601005
Minimum: 0
Maximum: 98
Mean: 38.783
Type: Continuous
Decimal: 0
Start: 162
End: 163
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Jumlah jam kerja dari seluruh pekerjaan seminggu terakhir: (jam)
Interviewer instructions
1. Tuliskan jumlah jam kerja dari seluruh selama seminggu terakhir dan isikan kedalam kotak yang telah disediakan.
2. Jika mereka sementara tidak bekerja isikan angka "00".

Description

Definition
Jumlah jam kerja adalah lama waktu (dalam jam) yang digunakan untuk bekerja dari seluruh pekerjaan yang dilakukan selama seminggu terakhir.
Universe
Hanya untuk anggota rumah tangga yang bekerja.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.