IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / JAM_2010_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2010

Jamaica, 2011
Get Microdata
Reference ID
JAM_2010_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
18566
Downloads
1744
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Jamaica-2010-full
    data-

In last FY, losses as % of annual sales due to power outages (c9a)

Data file: Jamaica-2010-full data-

Overview

Valid: 240
Invalid: 136
Minimum: -9
Maximum: 20
Mean: -1.25
Standard deviation: 4.762
Type: Continuous
Decimal: 0
Start: 125
End: 126
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Please estimate the losses that resulted from power outages either as a percentage of total annual sales or as total annual losses.
Interviewer instructions
The Manager should estimate the amount of production lost because of power outages.
Question post text
PROVIDE EITHER ONE OR THE OTHER, NOT BOTH
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.