IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IND_2002_NSS58-SCH3.1_V01_M
central

National Sample Survey 2002 (58th round) - Schedule 3.1 - Village Facilities

India, 2002
Reference ID
IND_2002_NSS58-SCH3.1_v01_M
Producer(s)
National Sample Survey Organisation (NSSO)
Metadata
DDI/XML JSON
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
24102
Downloads
6517
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • multipliers
  • NSS58_Sch31_bk1
  • NSS58_Sch31_bk2
  • NSS58_Sch31_bk3
  • NSS58_Sch31_bk4

Data file: NSS58_Sch31_bk2

Block 2: Particulars of field operation
Items in this block are self-explanatory. While filling up the schedule, care is to be taken to record the actual time taken in canvassing the schedule in minutes in whole numbers (and not in hours) against item 3 of this block. It will not include the time taken by the investigator to finalise the schedule. Dates of survey / inspection, etc should be made in six digits - 2 digits each for day, month and year.

Cases: 4646
Variables: 19

Variables

villid
Serial. no. of Sample Village
state
State
ID
Workfile No.
schedule
Schedule Number
sector
Sector
statereg
State-Region
stratum
Stratum
substratum
Sub-Stratum no.
district
District
subround
Sub-Round
sub_sample
Sub-Sample
FSU_No
FSU Serial No.
NSS
NSC
MLT
S31B2_v2i
Date of Survey
S31B2_v2iv
Date of Despatch
S31B2_v3
Time to canvass(mins)
weight
Weighting coefficient
Total: 19
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.