IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRY_2011_WARC_V01_M / variable [F2]
central

Evaluating Impacts of Access and Sustainability of Potable Water Projects 2011

Paraguay, 2011
Reference ID
PRY_2011_WARC_v01_M
Producer(s)
Luis Alberto Andres, Darwin Marcelo, Inter-American Development Bank, Ministry of Health of Paraguay
Metadata
DDI/XML JSON
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
15125
Downloads
4477
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • BM_PY_hogares_final
  • BM_PY_individuos_final

Cuántos días trabajó la semana pasada [nombre] considerando todos sus trabajos? (mo8)

Data file: BM_PY_individuos_final

Overview

Valid: 22832
Invalid: 0
Type: Discrete
Decimal: 0
Start: 111
End: 112
Width: 2
Range: -
Format:

Questions and instructions

Categories
Value Category
0
1
2
3
4
5
6
7
98 Ns/Nc
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.