IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRY_2011_WARC_V01_M / variable [F1]
central

Evaluating Impacts of Access and Sustainability of Potable Water Projects 2011

Paraguay, 2011
Reference ID
PRY_2011_WARC_v01_M
Producer(s)
Luis Alberto Andres, Darwin Marcelo, Inter-American Development Bank, Ministry of Health of Paraguay
Metadata
DDI/XML JSON
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
15733
Downloads
4499
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • BM_PY_hogares_final
  • BM_PY_individuos_final

Observaciones (mobse)

Data file: BM_PY_hogares_final

Overview

Valid: 10
Invalid: 0
Type: Discrete
Start: 364
End: 383
Width: 20
Format:

Questions and instructions

Categories
Value Category
ACCION SOCIAL
CADA 3 MESES
DE SU MAMA
EL PAPA DE SUS HIJOS
EX COMBATIENTE
EX CONBATIENTE
MILITAR RETIRADO
POR 4 MESES TEKOPORA
PROPAIS
TEKOPORA
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.