IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRY_2011_WARC_V01_M / variable [F1]
central

Evaluating Impacts of Access and Sustainability of Potable Water Projects 2011

Paraguay, 2011
Reference ID
PRY_2011_WARC_v01_M
Producer(s)
Luis Alberto Andres, Darwin Marcelo, Inter-American Development Bank, Ministry of Health of Paraguay
Metadata
DDI/XML JSON
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
15726
Downloads
4499
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • BM_PY_hogares_final
  • BM_PY_individuos_final

Observaciones (mobsd)

Data file: BM_PY_hogares_final

Overview

Valid: 113
Invalid: 0
Type: Discrete
Start: 344
End: 363
Width: 20
Format:

Questions and instructions

Categories
Value Category
150000 POR MES
35000 POR HIJO MENOR
400000 C/3 MESES
660000 X 3 MESES
ACC. SOCIAL
ACCION SOCIAL
ACCION SOCIAL X 1 HI
APA
AYUDA SOCIAL
C 4 MESES
C 4 MESES TEKOPORA
C/ 2 MESES
C/3MESES ACCION SOCI
CADA 2 MESES
CADA 3 MESES TEKOPOR
CADA 3MESES TEKOPORA
CADA 4 MESES
CADA 4 MESES TEKOPOR
CADA 6MESES COBRA
COBRA C/3 MESES
COBRA DE TECOPORA
COBRA POR ACCION SOC
MENSUAL
N ELLOS
NVIA SU HIJA
POR 3 MESES
PROYECTO TECOPORA
SE COBRA CADA MES
TECOPORA
TECOPORA C 3 MESES
TECOPORA CADA 2 MESE
TECOPORA X6 MESES
TEKO PORA
TEKOPORA
TELKOPORA
TELORORA
TERCERA EDAD
X M3 MESES TEKOPORA
X 3 MESES TECOPORA
X CDA 3MESES TEKOPOR
X3 MESES TECOPORA
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.