IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZWE_2011_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2011

Zimbabwe, 2011 - 2012
Get Microdata
Reference ID
ZWE_2011_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
27197
Downloads
3534
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Zimbabwe-2011-full
    data-

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Zimbabwe-2011-full data-

Overview

Valid: 18
Invalid: 581
Type: Discrete
Decimal: 0
Start: 121
End: 122
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 do not know
-6 still in process
-5 application denied
1 less than one day
7
14
20
30
40
42
60
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.