IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LKA_2011_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2011

Sri Lanka, 2011
Get Microdata
Reference ID
LKA_2011_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Dec 20, 2012
Last modified
Mar 29, 2019
Page views
19130
Downloads
1769
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • SriLanka-2011-full
    data-

G3. how many days did it take to obtain it from the day of t (g3)

Data file: SriLanka-2011-full data-

Overview

Valid: 55
Invalid: 555
Type: Discrete
Decimal: 0
Start: 684
End: 686
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 DON'T KNOW (SPONTANEOUS)
-6 STILL IN PROCESS
-5 APPLICATION DENIED
1 LESS THAN ONE DAY
2
7
9
14
15
20
28
30
60
75
90
180
270
365
400
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.