IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IND_2000_NSS56-SCH2.2_V01_M / variable [F3]
central

National Sample Survey 2000-2001 (56th round) - Schedule 2.2 - Unorganized Manufacturing

India, 2000 - 2001
Reference ID
IND_2000_NSS56-SCH2.2_v01_M
Producer(s)
National Sample Survey Organisation (NSSO)
Metadata
DDI/XML JSON
Study website
Created on
Jan 22, 2012
Last modified
Mar 29, 2019
Page views
38247
Downloads
6265
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • all201
  • all202
  • all203
  • all204
  • all205
  • all206

Expenses on electricity charges (b3_321)

Data file: all203

Overview

Valid: 222529
Invalid: 0
Minimum: 0
Maximum: 7200000
Type: Continuous
Decimal: 2
Start: 329
End: 337
Width: 9
Range: -
Format:

Questions and instructions

Literal question
Expenses on electricity charges
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.