IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LBR_2007_NEDUC_V01_M / variable [F15]
central

National Education Census 2007

Liberia, 2007
Reference ID
LBR_2007_NEduC_v01_M
Producer(s)
Ministry of Education
Metadata
DDI/XML JSON
Created on
Nov 30, 2011
Last modified
Mar 29, 2019
Page views
51252
Downloads
9230
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • S1
  • S2a
  • s3d
  • s3c
  • s3e
  • s3a
  • s3b
  • s4a
  • s4b
  • s4c
  • s4d
  • s4e
  • s5a
  • s5b
  • s6a
  • s6b
  • s7a
  • s7b
  • s3f
  • 3g

OTHER SPECIFY (specify)

Data file: s6a

Overview

Valid: 260
Type: Discrete
Start: 27
End: 136
Width: 110
Format:

Questions and instructions

Literal question
No Literal Question.
Categories
Value Category
2 buildings are makeshift
Additional 6 class rooms with principal office & auditorium
Additional Annex -Make Shift
All information about the Elementary is true about the Jr. High, to avoid repetition
Auditorum
CHURCH BUILDING
Chruch building
Church
Church Bldg.
Church Building
Church Building is been Used.
Church Building is been used.
Church Building is used
Church Builidng for school
Church Builing
Church Bulding
Church Buliding
Church House
Church Propoety
Church bld. For School
Church building
Church building used for school
Church for school because under construction
Church is used as School
Church used for School
Church's building. Make shift annex attach to church make shift building
Classes are presently held at Bomi Junior High Campus while renovation is going on at C. H. Deweh High Campus.
Classes on Porch
Council Hall
Currently occupies church's building
Do not have its own edifice. Occupies church's building
Door locks are all spoiled
Dwelling House
Dwelling house
E.N.I. Mission Facilities
Funitures offiice material
HallLearning activities take place in the hall
Hospital as school because of no school building
If other specifly
Laying in the Church
Learing is done at the palava Hut
Learning activities is done in the church house
Learning activities take place in a reed building
Learning activities take place in the S. D. A. Church
Learning activities take place in the church
Learning activity is done at the church building
Learning is taking in a hall
Learning is taking place in a hall
Learning is taking place in a mat building
Learning is taking place in the Town Hall
Learning is taking place out there Town Hall
Memo Graplung machine
Mud bricks
Mud with tapolin roof presently plus Church building
One is Make Shift
One side of the buiding is destroyed
Open bldg.
Operating in the church
Palava Hut
Palava Hut is been used due to major damage of the school
Peace Wind Shelter
Porch
Presently using church buidling for classes
Private Home
Reeds Mats and Rooftarpoulin
Rented Building
Renting in church buidling
School building in palava hut
School in church building
School is in church building
School is using church building
School using Church building
Schooling in government building
Some classes use mat
Sticks and Thatch
Teaching in the Town Hall
Thatch and Sticks
Thatch/ Stick
Thatcth and Sticks
The School is using a Church Building.
The School is using church building
They are using a church building
They are using a private building
They do not have a school building
They used private Building
This school is in a church building, the main building is destroyed
This school is using a church building. The main building is destroyed.
This school is using a church but the school is under construction
Town
Town Hall
Two classrooms destroyed
Under Construction
Under construction
Under tapaulin roof
Used Church Building
Using Church Bldg.
Using Church Building
Using Church Building as an annex to the 3 classrooms
Using Church Building for School
Using Church Building presently
Using Church bldg.
Using Church/Town Hall
Using District Clinic
Using Private Building
Using Temporary buliding built by NRC
Using Town Hall
Using Town hall
Using a Church
Using a church building
Using church building
Using church building for classes
Using church building presently
Using church building presently for classes
Using church building presently without classrooms
Using church buliding presently
Using mat and tarpolin roof
Using other areas
Using palava Hut for Classes Presently
Using private building on grattis
Using someone house
Using tent for school
Using thatch hut for classes
Using the Church Building as a school
Using the Mosque as a school
Using the town hall as school
Water street Market Building
Zinc roofing, built with reeves
anpoenhousenotcompleted
church Builing
church bldg.
church building
church buliding
dormitory major damage
i
new construeted building not completed
no building
no door window building is leaking
open bldg.
school was burn down
someone's house
still under construction
tarpol in used
temporary house for use
the building is tsrpoline
the school is using a temporror area
the school s using Church Building
under construction
using Hall
using Town Hall
using a house
using church bldg
using church bldg.
using church building
using dwelling house
using the Town Hall
using the church building
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.