IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / CMR_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Cameroon, 2024 - 2025
Get Microdata
Reference ID
CMR_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 15, 2025
Last modified
May 15, 2025
Page views
250
Downloads
6
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Cameroon-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Cameroon-2024-full-data.dta

Overview

Valid: 41
Invalid: 574
Minimum: -6
Maximum: 75
Type: Discrete
Decimal: 0
Start: 223
End: 224
Width: 2
Range: -6 - 75
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 5
12.2%
-5 Application denied 1
2.4%
1 One day or less 0
0%
3 1
2.4%
5 2
4.9%
7 4
9.8%
10 3
7.3%
12 2
4.9%
14 2
4.9%
15 2
4.9%
20 1
2.4%
21 2
4.9%
30 6
14.6%
35 1
2.4%
40 1
2.4%
42 1
2.4%
45 1
2.4%
60 3
7.3%
62 1
2.4%
75 2
4.9%
Sysmiss 574
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.