IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / AGO_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Angola, 2024 - 2025
Get Microdata
Reference ID
AGO_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 15, 2025
Last modified
May 15, 2025
Page views
326
Downloads
3
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Angola-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Angola-2024-full-data.dta

Overview

Valid: 45
Invalid: 385
Minimum: -9
Maximum: 360
Type: Discrete
Decimal: 0
Start: 186
End: 188
Width: 3
Range: -9 - 360
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 1
2.2%
-6 Still in process 10
22.2%
-5 Application denied 0
0%
1 One day or less 4
8.9%
3 2
4.4%
4 1
2.2%
5 3
6.7%
7 5
11.1%
12 1
2.2%
14 2
4.4%
15 1
2.2%
20 1
2.2%
30 8
17.8%
45 1
2.2%
60 1
2.2%
90 2
4.4%
180 1
2.2%
360 1
2.2%
Sysmiss 385
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.