IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TGO_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Togo, 2023
Get Microdata
Reference ID
TGO_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 24, 2025
Last modified
Jan 24, 2025
Page views
7406
Downloads
57
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Togo-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Togo-2023-full-data.dta

Overview

Valid: 8
Invalid: 140
Minimum: -6
Maximum: 90
Type: Discrete
Decimal: 0
Start: 172
End: 173
Width: 2
Range: -6 - 90
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 3
37.5%
-5 Application denied 1
12.5%
1 One day or less 1
12.5%
2 1
12.5%
30 1
12.5%
90 1
12.5%
Sysmiss 140
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.