IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2024_WBES-GE_V01_M / variable [F1]
central

World Bank Enterprise Survey Green Economy 2024

Philippines, 2024
Get Microdata
Reference ID
PHL_2024_WBES-GE_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Dec 12, 2024
Last modified
Dec 12, 2024
Page views
7999
Downloads
76
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Philippines-ES-GE-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Philippines-ES-GE-2024-full-data.dta

Overview

Valid: 51
Invalid: 973
Minimum: -9
Maximum: 60
Type: Discrete
Decimal: 0
Start: 214
End: 215
Width: 2
Range: -9 - 60
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
3.9%
-6 Still in process 0
0%
-5 Application denied 1
2%
1 One day or less 19
37.3%
2 3
5.9%
3 5
9.8%
5 1
2%
7 13
25.5%
10 4
7.8%
14 1
2%
20 1
2%
60 1
2%
Sysmiss 973
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.