IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PHL_2024_WBES-GE_V01_M / variable [F1]
central

World Bank Enterprise Survey Green Economy 2024

Philippines, 2024
Get Microdata
Reference ID
PHL_2024_WBES-GE_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Dec 12, 2024
Last modified
Dec 12, 2024
Page views
7836
Downloads
76
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Philippines-ES-GE-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Philippines-ES-GE-2024-full-data.dta

Overview

Valid: 137
Invalid: 887
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 960
End: 962
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 3
2.2%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 24
17.5%
2 4
2.9%
3 11
8%
4 2
1.5%
5 13
9.5%
6 2
1.5%
7 22
16.1%
10 1
0.7%
14 9
6.6%
15 6
4.4%
19 1
0.7%
20 4
2.9%
21 2
1.5%
24 1
0.7%
25 1
0.7%
30 16
11.7%
60 5
3.6%
90 2
1.5%
100 1
0.7%
120 1
0.7%
150 1
0.7%
180 1
0.7%
210 1
0.7%
300 1
0.7%
365 2
1.5%
Sysmiss 887
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.