| Value | Category | Cases | |
|---|---|---|---|
| 1 | material for fencing | 292 |
49.2%
|
| 2 | material for the demonstration plot | 20 |
3.4%
|
| 3 | money | 120 |
20.2%
|
| 4 | loaned tools | 33 |
5.6%
|
| 5 | loaned animals | 2 |
0.3%
|
| 6 | worked on the demonstration plot | 55 |
9.3%
|
| 7 | worked on ftc structures | 52 |
8.8%
|
| 8 | other | 20 |
3.4%
|
| Sysmiss | 799 |