IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LBR_2017_ES_V01_M / variable [F1]
central

Enterprise Survey 2017

Liberia, 2017
Get Microdata
Reference ID
LBR_2017_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
7610
Downloads
258
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • liberia_2017_full_data

How Many Days Did It Take For You to Obtain A Water Connection? (c13)

Data file: liberia_2017_full_data

Overview

Valid: 27
Invalid: 124
Type: Discrete
Decimal: 0
Start: 136
End: 137
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
3
6
7
8
10
14
15
30
60
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.