IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2015_ES_V01_M / variable [F3]
central

Enterprise Survey 2015

Indonesia, 2015
Get Microdata
Reference ID
IDN_2015_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jan 18, 2017
Last modified
Mar 29, 2019
Page views
14226
Downloads
1024
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • indonesia_2015_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: indonesia_2015_full_data

Overview

Valid: 53
Invalid: 1267
Type: Discrete
Decimal: 0
Start: 218
End: 219
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
-7 Does not apply
-6
1
2
3
4
5
6
7
10
14
20
30
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.