Value | Category |
---|---|
BUMK (SPP) 2012-2013 | |
GEDUNG POSYANDU (2012) SEBELAH TIMUR MASJID BAITUL MAKMUR +/- 50 METER | |
MCK | |
MCK (2012) | |
PENGERASAN JALAN (2009) | |
RABAT BETON (2011) | |
RABAT BETON (2012) | |
RABAT BETON (2013) | |
SALURAN IRIGASI (2013) | |
SALURAN PEMBUANGAN 150 M2 (2010) | |
SARANA AIR BERSIH | |
SERAK SIRTU (KERIKIL) DAN BOX CULVERT (2012) | |
SIRTU JALAN LORONG PUNTI (2010) | |
SPP | |
SPP (MODAL USAHA TANI) | |
SPP KELOMPOK RAJA CUT (2010) | |
TALUT PENANGKAL PASANG (2012)/SEBELAH UTARA JALAN SINGKIL-RIMO SEPANJA | |
W |