Value |
Category |
BAK PENAMPUNGAN AIR (2010)/ MASING-MASING RUMAH |
|
BUMG(MODAL USAHA)2013 |
|
BUMK (2012-2013) SPP TERNAK AYAM |
|
BUMK (PENGADAAN MESIN PERONTOK PADI (2 UNIT) DAN MESIN KIPAS (1 UNIT) |
|
BUMK (PENYEDIAAN TRAKTOR) |
|
FINISHING LANTAI TBM (2011) |
|
MCK |
|
MCK (2009), SEBELAH UTARA JALAN DESA +/- 5 METER |
|
PEMBANGUNAN TALUT JALAN DERMAGA (2009) |
|
PEMBUATAN JALAN BARU (2012)SEBELAH BARAT KAMPUNG DUSUN 2 +/- 200 METER |
|
PEMBUATAN TEMPAT PARKIR (2011) MASJID BAITUL ABRAR DUSUN 2 |
|
PEMBUKAAN JALAN BARU, PENGERASAN + TALUT JALAN (2011) |
|
PENGERASAN JALAN (2011) |
|
PENGERASAN JALAN 2010 |
|
RABAT BETON DAN TALUD JALAN (2010) |
|
SALURAN IRIGASI (2010) |
|
SALURAN IRIGASI(2011) |
|
SALURAN PEMBUANGAN (2012) |
|
SPP |
|
SPP (2 KELOMPOK) |
|
SPP (2011) |
|
SPP BKPG |
|
SPP MODAL DAGANG (2009) |
|
TEMBOK PENAHAN TANAH/LENNING JALAN 2013 |
|
TPT/SALURAN |
|
W |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.