Value |
Category |
BUMG (SEWA PELAMINAN/TRATAK/KURSI) 2012 |
|
BUMK (2012) RABAT BETON 150M2 |
|
MCK (2011)/ MESJID AL HIDAYAH DUSUN MEKAR |
|
PEMBUATAN JALAN DAN PENGERASAN (2011) SEBELAH TIMUR KAMPUNG DUSUN 1 +/ |
|
PLAT BETON(2012) |
|
RABAT BETON (2012) |
|
RABAT BETON (2013), SEBELAH BARAT MASJID BABURRAHMAN +/- 1,5 KM |
|
RABAT BETON 2011 |
|
RABAT BETON ARAH |
|
RABAT BETON ARAH TIMUR POSKESDES |
|
SALURAN AIR/SPAL |
|
SALURAN IRIGASI 2012 |
|
SPP |
|
SPP (2 KELOMPOK) |
|
SPP PINJAMAN MODAL DAGANG (2009) |
|
TALUT JALAN (2011) |
|
TALUT JALAN (2013) |
|
TERATAK (2013) |
|
TIMBUN JALAN(2011) |
|
W |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.