Value |
Category |
BUMG/SPP PERTANIAN (2010) |
|
BUMK (PENGADAAN MESIN PERONTOK PADI (2 UNIT) DAN MESIN KIPAS (1 UNIT) |
|
GEDUNG TPA 2009/2010 |
|
MCK (2008), SEBELAH TIMUR MASJID BABURRAHMAN +/- 5 METER |
|
PEMBANGUNAN BENDUNGAN (2009) SEBELAH TIMUR KAMPUNG DUSUN 1 +/- 400 MET |
|
PEMBANGUNAN JALAN JEMBATAN (2012) |
|
PEMBUATAN BODI JALAN (JALAN BARU) |
|
PEMBUKAAN JALAN (2009) |
|
PEMBUKAAN JALAN ARAH TIMUR POSKESDES |
|
PEMBUKAAN JALAN BARU 2009 |
|
PENGERASAN JALAN (2010) |
|
PENGERASAN JALAN (2011) |
|
RABAT BETON |
|
RABAT BETON (2011), SEBELAH BARAT MESJID DUSUN BEMONG +/- 35 M |
|
SALURAN BETON (2011) |
|
SALURAN IRIGASI (2012) |
|
SALURAN IRIGASI 2012 |
|
SALURAN IRIGASI(2011) |
|
SALURAN PEMBUANG DAN TALUD 2009 |
|
SALURAN PEMBUANGAN(2010) |
|
SALURAN/SPAL |
|
SARANA AIR BERSIH |
|
SPP |
|
SPP (2008) |
|
SPP (2010) |
|
SPP (2011) |
|
SPP (2012) |
|
SPP (PINJAMAN MODAL USAHA) |
|
SPP BKPG (2008-2013) |
|
TALUD JALAN(2009) |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.