Value |
Category |
(PENENTUAN PENERIMA SIMPAN PINJAM, LANJUTAN PEMBANGUNAN RABA |
|
, SERTA LAPORAN TERAKHIR PELAKSANAAN KEGIATAN |
|
2 |
|
A UANG YANG ADA |
|
ABILA DANA NYA SUDAH TEREALISASI |
|
AKAN DI GAMPONG |
|
AKSANAKAN, PEMBUKAAN JALAN BARU |
|
ALUD JALAN DI DUSUN PISANG BEUNG |
|
ALUD(LANJUTAN DI DUSUN ANOEIK |
|
AM,PERTANGGUNG JAWABAN PROGRAM,RAPAT KELANJUTAN PROGRAM,SALU |
|
AN |
|
AN BARU DI LORONG KUBURAN |
|
AN BETON |
|
AN DATANG,MUSYAWARAH KELOMPOK PEREMPUAN DI DESA,MUSREMBANG,( |
|
AN KEGIATAN TALUD JALAN, PEMBENTUKAN PENGURUS BUMG |
|
AN LAHAN IRIGASI |
|
ANA KEGIATAN |
|
ANA SPP (PENERIMA MANFAAT) PEMBERITAHUAN KEGIATAN JALAN BARU |
|
ANAAN SARANA DAN PRASARANADI KUTA LHOK, DUSUN BERINGIN, BATE |
|
ANGA,PERHITUNGAN BIAYA KEGIATANM RABAT BETON DAN SALURAN PEM |
|
AOEIK |
|
APAN KEGIATAN |
|
ARU DAN BESERTA SEKRETARIS, BENDAHARA |
|
BABAH LHUNG) |
|
BAGAIMANA DAN PINJAMANAN DIPERGUNAKAN UNTUK PERTANIAN |
|
BAN PEMBANGUNAN TALUT DI DUSUN CEMPAKA, LAPORAN KEUANGAN PEM |
|
BETON |
|
BUATAN IRIGASI DI SAWAH |
|
DALAM BENTUK MATERIAL DAN BIAYA-BIAYA PROGRAM |
|
DAN LANJUTAN PEMBANGUNAN JALAN |
|
ELAKSANAAN KEGIATAN |
|
ERJA |
|
FAJAR) |
|
GUNAN YANG AKAN DIBANGUN |
|
H PINJAMAN SETIAP KELUARGA. MENSOSIALISASIKAN KEPADA MASYARA |
|
HADAP PROGRAM KEGIATAN YANG SUDAH BERJALAN |
|
HOK, LANJUTAN KEGIATAN PEMBANGUNAN JALAN SIRTU DI DUSUN KUTA |
|
I DUSUN FAJAR |
|
I,POMPANISASI,RABAT BETON,RAPAT PERTANGGUNG JAWABAN PROGRAM |
|
IKANNYA |
|
IR) |
|
JALAN,MEMBAHAS MENGENAI PEMBANGUNAN SALURAN PEMBUANGAN |
|
JAM, PELELANGAN BAHAN MATERIAL |
|
JAWABAN DANA,MEMBERITAHUIKAN MASYARAKAT TENTANG PROGRAM YANG |
|
JUTAN) TAHUN 2014 |
|
KEGIATAN |
|
KSANAAN KEGIATAN RABAT BETON |
|
LATIHAN KETRAMPILAN CARA MEMBUAT KAWAT BRONJONG |
|
M INI DISWADAYA OLEH MASYARAKAT, TERMASUK PENAMBAHAN DANA |
|
MBANGUNAN JALAN |
|
MPAN PINJAM, DAN UNTUK MENGAWASI PEMBANGUNAN INFRASTRUKTUR |
|
MPOK SPP |
|
N PROGRAM IRIGASI ALUE MEE |
|
N SPP |
|
N UNTUK MEMBANGUN MESJID,KETENTUAN PINJAMAN DANA,MEMBAHAS PE |
|
N, SOSIALISASI BUMG(BADAN USAHA MILIK GAMPONG) |
|
N/BIAYA-BIAYA PROGRAM |
|
NA, PENENTUAN KEGIATAN PEMBANGUNAN IRIGASI |
|
NAKAN |
|
NG JAWABAN PROGRAM YANG SUDAH SELESAI DI BANGUN (JALAN)PELEB |
|
NG PERTANGHGUNG JAWABAN PROGRAM,PERANCANGHAN BIAYA PROGRAM Y |
|
NGAN PEMBANGUNAN SALURAN PO TEUMEREHOM |
|
NGURUS PELAKSANAAN PEMBANGUNAN |
|
NJAM |
|
NTUAN DAN PERSIAPAN KEGIATAN |
|
PELAKSANAAN PEMBANGUNAN SALURAN AIR |
|
PEMBEBASAN LAHAN UNTUK KEGIATAN IRIGASI DAN LOKASI DIMANA YA |
|
PEMILIHAN PENGURUS BUMG |
|
PENERIMAAN DANA TERATAK |
|
PENGADAAN GENSET UNTUK DUSUN GUNUNG MERIAH |
|
PERSIAPAN PEMBUATAN JALAN DAN PELAKSANAAN PEMBUATAN JALAN |
|
PROGRAM |
|
PROGRAM PEMBANGUNAN TPT/SALURAN |
|
RAPAT PERTANGGUNG JAWABAN PROGRAM |
|
RENCANA PEMBANGUNAN PARIT/SALURAN |
|
RIMA MANFAAT SPP, PERANGKINGAN PELAKSANAAN KEGIATAN, MEMBAHA |
|
RJAKAN |
|
RUKTUR BKPG |
|
SALURAN) |
|
SERAH TERIMA SALURAN/TPT |
|
T KELOMPOK SPP/PEMBAGIAN UNG SPP |
|
TAN DARI PEMBANGUNAN SALURAN PEMBUANGAN |
|
TENTANG PEMAKAIAN DANADARI PROGRAM BKPG |
|
TENTANG SPP YANG MENUNGGAK |
|
TU PELAKSANAAN |
|
TUA BARU SPP,KEPUTUSAN UNTUK MEMBANGUN LENNING JALAN LORONG |
|
UN |
|
URUH,PELELANGAN TENDER |
|
USULAN PEMBANGUNAN SARANA AIR BERSIH 2014 |
|
USULAN PEMBUATAN MEUNASAH |
|
YA-BIAYA PROGRAM MEMBAHAS MASALAH PEMBANGUNAN KELANJUTAN PRO |
|
YANG AKAN DIBANGUN |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.