IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TUR_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Turkiye, 2013 - 2014
Get Microdata
Reference ID
TUR_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Dec 23, 2014
Last modified
Jun 14, 2022
Page views
20573
Downloads
1962
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • turkey_2013_full_data

Number of days it took to obtain a construction-related permit (g3)

Data file: turkey_2013_full_data

Overview

Valid: 116
Invalid: 1228
Type: Discrete
Decimal: 0
Start: 722
End: 724
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
-6
-5
1
2
3
4
5
7
10
14
15
20
30
40
45
80
90
150
180
270
360
365
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.