IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2005_SAKERNAS-FEB_V01_M / variable [F1]
central

National Labor Force Survey 2005

Indonesia, 2005
Reference ID
IDN_2005_SAKERNAS-FEB_v01_M
Producer(s)
Subdirectorate of Manpower Statistics
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
12709
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • sakernas05feb

Total work hours from the main job in the past one week (b4p9)

Data file: sakernas05feb

Overview

Valid: 120251
Invalid: 95524
Minimum: 0
Maximum: 98
Type: Continuous
Decimal: 0
Start: 50
End: 51
Width: 2
Range: -
Format:

Questions and instructions

Question pretext
- Q6 to Q14 are just for household members who currently are employed (Q2a.1 = 1 or Q3 = 1)
Literal question
Total work hours from the main job in the past one week:
____ hours
Interviewer instructions
Write down the working hours of the main job during the previous week. The method to calculate the working hours during the previous week is the same with the method to calculate the working hours for the whole work in Detail 6.b. Remember, the working hours of the main job must be less or equal to the working hours for the whole work performed during the previous week.

Description

Definition
Total working hours for the main job in a week: refer to the total hours used by an employee for his/her main job during a calendar week (excluding the time used for other activities which are not classified as "work")
Universe
Household members aged 10 years and over who are employed or temporarily not working
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.