Interviewer instructions
Items 4 and 5: Total time taken to canvass schedule 10 (in minutes): Total time taken to canvass schedule 10, which will include time taken to canvass block 9 also, will be recorded in item 4. Time taken to canvass block 9 only will be recorded against item 5. Entries in item 4 and 5 will be made in whole number in minutes. The time required to canvass the schedule should be the actual time to canvass the schedule and will not include the time needed by the investigator to finalise the schedule.