IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ALB_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Albania, 2008 - 2009
Get Microdata
Reference ID
ALB_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
42788
Downloads
3733
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Albania-2009--full
    data-

net book value of machinery vehicles, and equipment in last fiscal year (n6a)

Data file: Albania-2009--full data-

Overview

Valid: 65
Invalid: 110
Type: Discrete
Decimal: 0
Start: 762
End: 771
Width: 10
Range: -
Format:

Questions and instructions

Literal question
At the end of fiscal year 2007, what was the net book value, that is the value of assets after depreciation, of the following:
Machinery, vehicles, and equipment
Categories
Value Category
-9 don't know
110234
159000
500000
804606
1000000
1700000
2000200
3600000
8000000
8399067
10000000
16000000
18300000
18450000
19292178
20000000
22465000
22859913
25167372
33798712
45500000
49200000
61000000
68000000
73368000
90000000
171304000
257651752
390340000
1621952509
2000000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Net book value equals the purchase value minus depreciation.

The net book value represents the actual cost of assets at the time they were acquired, including all costs incurred in making the assets usable (such as transportation and installation) minus depreciation accumulated since the date of purchase. Included in the assets are all buildings, structures, machinery, and equipment (production, office, and transportation equipment) for which depreciation reserves are maintained. Accordingly, the value of assets at the end of the year includes the value of construction in progress.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.