IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MYS_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Malaysia, 2024 - 2025
Get Microdata
Reference ID
MYS_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
1084
Downloads
18
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Malaysia-2024-full-data.dta

Average Duration of Power Outages: Hours (c8a)

Data file: Malaysia-2024-full-data.dta

Overview

Valid: 121
Invalid: 858
Minimum: -9
Maximum: 24
Type: Discrete
Decimal: 0
Start: 237
End: 238
Width: 2
Range: -9 - 24
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.8%
0 46
38%
1 13
10.7%
2 23
19%
3 15
12.4%
4 5
4.1%
5 5
4.1%
6 7
5.8%
8 1
0.8%
10 1
0.8%
12 1
0.8%
24 3
2.5%
Sysmiss 858
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.