IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ECU_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Ecuador, 2024 - 2025
Get Microdata
Reference ID
ECU_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
919
Downloads
12
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Ecuador-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Ecuador-2024-full-data.dta

Overview

Valid: 26
Invalid: 319
Minimum: -6
Maximum: 365
Type: Discrete
Decimal: 0
Start: 458
End: 460
Width: 3
Range: -6 - 365
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 3
11.5%
-5 Application denied 1
3.8%
1 One day or less 1
3.8%
3 1
3.8%
7 1
3.8%
10 1
3.8%
15 5
19.2%
20 3
11.5%
30 3
11.5%
35 1
3.8%
48 1
3.8%
60 2
7.7%
90 1
3.8%
270 1
3.8%
365 1
3.8%
Sysmiss 319
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.