IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / COD_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Congo, Dem. Rep., 2024
Get Microdata
Reference ID
COD_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
575
Downloads
8
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • DRC-2024-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: DRC-2024-full-data.dta

Overview

Valid: 181
Invalid: 844
Minimum: -9
Maximum: 120
Type: Discrete
Decimal: 0
Start: 117
End: 119
Width: 3
Range: -9 - 120
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 3
1.7%
-6 Still in process 17
9.4%
-5 Application denied 1
0.6%
1 One day or less 16
8.8%
2 5
2.8%
3 11
6.1%
4 3
1.7%
5 10
5.5%
6 4
2.2%
7 16
8.8%
8 2
1.1%
10 6
3.3%
12 4
2.2%
14 11
6.1%
15 6
3.3%
16 2
1.1%
18 1
0.6%
20 8
4.4%
21 10
5.5%
24 2
1.1%
28 2
1.1%
30 18
9.9%
34 1
0.6%
36 1
0.6%
37 1
0.6%
45 1
0.6%
46 1
0.6%
55 1
0.6%
60 5
2.8%
72 3
1.7%
90 5
2.8%
120 4
2.2%
Sysmiss 844
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.