IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Sierra Leone, 2022 - 2023
Get Microdata
Reference ID
SLE_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 24, 2025
Last modified
Jan 24, 2025
Page views
7411
Downloads
81
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • SierraLeone-2023-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: SierraLeone-2023-full-data.dta

Overview

Valid: 40
Invalid: 169
Minimum: -6
Maximum: 30
Type: Discrete
Decimal: 0
Start: 217
End: 218
Width: 2
Range: -6 - 30
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 1
2.5%
-5 Application denied 0
0%
1 One day or less 5
12.5%
2 2
5%
3 2
5%
7 13
32.5%
12 1
2.5%
14 9
22.5%
15 1
2.5%
21 4
10%
30 2
5%
Sysmiss 169
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.