IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2023_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2023

Sierra Leone, 2022 - 2023
Get Microdata
Reference ID
SLE_2023_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Jan 24, 2025
Last modified
Jan 24, 2025
Page views
7394
Downloads
81
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • SierraLeone-2023-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: SierraLeone-2023-full-data.dta

Overview

Valid: 95
Invalid: 114
Minimum: -6
Maximum: 90
Type: Discrete
Decimal: 0
Start: 186
End: 187
Width: 2
Range: -6 - 90
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 3
3.2%
-5 Application denied 1
1.1%
1 One day or less 10
10.5%
3 5
5.3%
4 1
1.1%
5 1
1.1%
6 1
1.1%
7 32
33.7%
14 19
20%
15 2
2.1%
21 7
7.4%
28 1
1.1%
30 3
3.2%
31 4
4.2%
38 1
1.1%
45 1
1.1%
60 2
2.1%
90 1
1.1%
Sysmiss 114
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.