IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / COG_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Congo, Rep., 2024
Get Microdata
Reference ID
COG_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
Dec 12, 2024
Last modified
Dec 12, 2024
Page views
9480
Downloads
71
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • CongoRep-2024-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: CongoRep-2024-full-data.dta

Overview

Valid: 40
Invalid: 325
Minimum: -9
Maximum: 30
Type: Discrete
Decimal: 0
Start: 222
End: 223
Width: 2
Range: -9 - 30
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 2
5%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 14
35%
3 4
10%
4 1
2.5%
5 8
20%
6 1
2.5%
7 5
12.5%
10 1
2.5%
14 3
7.5%
30 1
2.5%
Sysmiss 325
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.