IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2016_LWHIE-F4_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2016, Fourth Follow-up Survey

Rwanda, 2016
Get Microdata
Reference ID
RWA_2016_LWHIE-F4_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
68529
Downloads
385
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lwh_followup4

P1 A C1: Why was the harvested amount zero? (CRP_08_0_1_1_1)

Data file: lwh_followup4

Overview

Valid: 41
Invalid: 964
Minimum: 1
Maximum: 999
Type: Continuous
Decimal: 0
Start: 1368
End: 1370
Width: 3
Range: 1 - 999
Format: Numeric

Others

Notes
P1 A C1 Why was the harvested amount zero?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.